British Industrial Competitiveness Scheme 2026: Save Up to 25% on Manufacturing Electricity Costs


Applications close 30 November 2026 — eligible manufacturing businesses in Dorset and across Great Britain are being urged to act now.
Rising energy costs have placed considerable pressure on British manufacturers in recent years. Now, a government initiative could provide welcome financial relief, with eligible businesses potentially reducing their electricity costs by up to 25%.
The British Industrial Competitiveness Scheme (BICS) is designed to help thousands of manufacturing businesses reduce their operating costs, improve competitiveness and free up funds for future investment.
However, there is an important deadline approaching.
Applications must be submitted by 11:59pm on Monday 30 November 2026.
At Ledgers Accountants, we want to ensure that manufacturers across Bournemouth, Christchurch, Poole, Dorset and the surrounding areas are aware of the opportunity and have time to explore whether their businesses could benefit.
What Is the British Industrial Competitiveness Scheme?
The British Industrial Competitiveness Scheme is a UK Government initiative aimed at reducing electricity costs for eligible manufacturing businesses in Great Britain.
The scheme provides exemptions from three charges that contribute to commercial electricity bills:
Renewables Obligation (RO) — a charge supporting renewable electricity generation.
Feed-in Tariffs (FiT) — a charge associated with supporting smaller-scale renewable electricity generation.
Capacity Market (CM) — a mechanism designed to help ensure sufficient electricity generation capacity is available.
By removing these costs for qualifying manufacturing activities, the government aims to help British businesses compete more effectively with overseas manufacturers, where industrial electricity prices can be lower.
The government estimates that more than 10,000 businesses could benefit from the scheme.
For eligible manufacturers, the potential savings could be significant.
How Much Could Your Manufacturing Business Save?
The government estimates that BICS could reduce electricity costs by up to £40 per megawatt hour (MWh), equivalent to savings of up to 25%.
For businesses with substantial electricity consumption, this could represent a meaningful reduction in annual operating expenditure.
The following examples illustrate the potential savings using the government's maximum estimated reduction of £40 per MWh.
Annual Electricity Consumption | Potential Annual Saving |
100 MWh | Up to £4,000 |
250 MWh | Up to £10,000 |
500 MWh | Up to £20,000 |
1,000 MWh | Up to £40,000 |
These figures are illustrative maximums rather than guaranteed savings. Actual benefits depend on qualifying electricity consumption, applicable exemptions, electricity charges and the final scheme arrangements.
When Will the Savings Begin?
Eligible businesses are expected to begin receiving relief from April 2027, with further exemptions introduced from October 2027.
The government has also announced an additional payment during 2027, intended to provide a benefit approximately equivalent to an extra year's relief.
For qualifying businesses, the combination of lower ongoing electricity costs and additional support could improve cash flow, protect margins and create opportunities for reinvestment.
Who Is Eligible for the British Industrial Competitiveness Scheme?
BICS is specifically targeted at qualifying manufacturing activities rather than businesses generally.
A business must satisfy the scheme's eligibility requirements, including:
1. Companies House Registration
The business must be registered with Companies House.
2. Eligible Manufacturing Sector
The business must operate within an eligible manufacturing industry, as identified through the government's specified Standard Industrial Classification (SIC) codes.
3. Qualifying Manufactured Products
The business must manufacture eligible products in Great Britain.
Product eligibility is assessed using the relevant Harmonised System (HS) classification codes.
4. Minimum Electricity Consumption
The manufacturing site must meet the scheme's electricity consumption requirements, including a minimum of 33 MWh (33,000 kWh) of grid-supplied electricity annually.
Supporting electricity consumption evidence will be required.
What If Your Business Manufactures Several Different Products?
Some manufacturers produce a combination of eligible and ineligible products.
Depending on the circumstances, these businesses may still qualify for partial relief relating to electricity used in eligible manufacturing activities.
Eligibility is determined by the government's detailed criteria, so businesses should not assume they are excluded simply because only part of their production falls within a qualifying category.
The official government guidance includes further information and an eligibility checking process.
Why This Scheme Matters for Manufacturers in Dorset
Manufacturing remains an important part of the local economy, supporting employment, specialist skills and supply chains throughout Dorset and the wider South Coast.
From engineering and precision manufacturing to specialist components and industrial production, businesses across Bournemouth, Christchurch, Poole and surrounding areas face many of the same challenges as manufacturers nationally.
Electricity costs can be a significant expense, particularly for businesses operating energy-intensive machinery, production equipment and manufacturing processes.
For qualifying businesses, BICS could help to:
Reduce ongoing electricity expenditure.
Improve operating margins and profitability.
Release working capital for other business priorities.
Support investment in equipment, technology and productivity.
Strengthen competitiveness in domestic and international markets.
Even relatively modest percentage reductions in energy expenditure can make a substantial difference over the course of a financial year.
For business owners already reviewing costs and planning their budgets for 2027, the scheme is worth investigating.
BICS Application Deadline: 30 November 2026
The deadline to apply is 11:59pm on Monday 30 November 2026.
With the application window closing shortly, potentially eligible manufacturers should begin reviewing their position without delay.
Businesses may need to provide supporting information including:
Companies House registration details.
Manufacturing site information.
Electricity meter references.
Evidence of electricity consumption, including six consecutive months of relevant records.
Details of the products manufactured.
Information demonstrating that manufacturing activities meet the scheme's eligibility requirements.
Businesses operating multiple manufacturing sites or using shared electricity supplies may need to provide additional supporting evidence.
Importantly, the government advises that applications cannot be amended after submission, making it essential to check the information carefully before applying.
Waiting until the final few days could leave insufficient time to gather the necessary documentation.
How Can Ledgers Accountants Help?
Government support schemes can offer valuable financial benefits, but understanding the eligibility requirements and gathering the right information is not always straightforward.
At Ledgers Accountants, we work with businesses across Dorset and the surrounding areas, helping owners and directors understand their finances, manage costs and make informed commercial decisions.
If you operate a manufacturing business and believe you may qualify for the British Industrial Competitiveness Scheme, we encourage you to contact our team as soon as possible.
We can discuss the published requirements with you, help you consider the potential financial implications and identify where additional specialist guidance may be appropriate.
Even if you're unsure whether your business qualifies, it's worth exploring the opportunity before the application deadline passes.
Don't Miss Out — Speak to Ledgers Before 30 November
With potential electricity savings of up to 25%, BICS could provide valuable support for eligible manufacturing businesses.
However, the opportunity is time-sensitive.
Applications close at 11:59pm on Monday 30 November 2026.
If you operate a manufacturing business in Bournemouth, Christchurch, Poole, Dorset or the surrounding areas, now is the time to establish whether you could benefit.
Contact Ledgers Accountants today to discuss your potential eligibility and the next steps.
You can also find full eligibility details and application guidance on the official government website:
Information correct as at 6 November 2026. This article provides general business information and does not constitute a determination of eligibility. Savings estimates are illustrative and subject to the scheme's rules. Businesses should consult the official government guidance before submitting an application.
.png)


